Alex Fraser Group operates a busy recycling depot in Clarinda, processing and dispatching recovered materials around the clock. Infrastructure Works was engaged to supply and install yard lighting for the depot’s truck and materials handling area, giving operators and drivers reliable visibility across extended and after-hours shifts.
iWorks installed Duravision LED floodlights mounted on winch-down poles (Ezywinch) set on Kelly Blocks; a combination chosen for a working yard where uptime and easy access matter more than a fixed, in-ground installation. The poles let the depot bring lights to ground level for maintenance without hiring an elevated work platform, and the Kelly Block bases meant no excavation or concrete pour was needed to get them in place.
Project highlights:
- Duravision LED floodlight clusters installed across the yard on winch-down poles
- Poles lower to ground level for cleaning, globe changes or repairs without an EWP
- Kelly Block bases give a stable, relocatable footing with no excavation required
- Poles positioned and staged around live truck movements and ongoing yard operations
The result is a well-lit, safer yard for night and early-morning operations, delivered with minimal disruption to a site that doesn’t stop; a practical example of smarter, safer, more efficient infrastructure at work.